St. Padre Pio Church, Vaughan

Envision. Evaluate. Excel.

Cost Planning

This project consisted of the construction of a new church with a gross floor area of approximately 22,000 sq. ft. above grade, which included a mezzanine level as well as a tower level, and 19,700 sq. ft. below grade.